Just attempted SSC CGL 2021 Tier-I (HO 21/04/2022 S-3) Test Scored::47.5/ 200 Test listTake Test
Ytube Answers
A and B can do a job in 10 days and 5 days, respectively. They worked together for two days, after which B was replaced by C and the work was finished in the next three days. How long will C alone take to finish 60% of the job?
For doing a certain work, the efficiencies of A, B and C are in the ratio 2 : 3 : 5. Working together, they can complete the same work in 15 days. B and C can complete 80% of the original work in:
Two poles of equal height are standing opposite to each other on either side of a road which is 100 m wide. From a point between them on road, angles of elevation of their tops are 30° and 60°. The height of each pole in meter, is:
A buys an article for Rs.900 and sells it to B at a profit of 25%. B sells it to C, who sells it for Rs.1,350, at a loss of 10%. What profit percent (to the nearest integer) did B make?