Uses Artificial Intelligence.
Work Time Questions generally have two Data given in it 1. Can do/complete Work time 2. Actual Work Condition for doing that Work.
ScoreKhel Formula of Work Time (works in all Que)
or fullwork
:: time A/B/C worked actually A/B/C:: time in which A/B/C can complete the work working alone. ±:: determined by nature of work, -ve if a person destroys the work.
Currently, Solver Can solve que with max 3 person Only. Also Que with Efficieny cannot be solved by the solver, the Module for efficieny Ques will start working Soon!!. Please Dont use abbreviation as it cannot be read by our server.
Just attempted SSC CGL 2021 Tier-I (HO 21/04/2022 S-3) Test Scored::47.5/ 200 Test listTake Test
Raja sen
Just attempted Profit Loss & Discount Test Scored::0/ 76 Test listTake Test
Ytube Answers
The angle of elevation of the top of a chimney and roof of the building from a point on the ground are x and 45° respectively. The height of buidling is h metre. Then the height of the chimney,(in metre) is
A and B can do a piece of work in 36 days. B and C can do the same work in 60 days. A and C can do the same work in 45 days. In how many days can A alone complete the same work?
A tank is filled by three pipes with uniform flow. The first two pipes operating simultaneously fill the tank in the same time during which the tank is filled by the third pipe alone. The second pipe fills the tank 5 hours faster than the first pipe and 4 hours slower than the third pipe. The time required by the first pipe is:
For doing a certain work, the efficiencies of A, B and C are in the ratio 2 : 3 : 5. Working together, they can complete the same work in 15 days. B and C can complete 80% of the original work in:
The marked price of an article is 50% above cost price. When marked price is increased by 20% and the selling price is increased by 20%, the profit doubles. If original marked price is Rs 300, then the original selling price is: