Vijay bought a fridge and a washing machine together for Rs. 38,200. He sold the fridge at a profit of 15% and washing machine at a loss of 24% and both are sold at the same price. The cost price of the washing machine is:
A can do a piece of work in 20 days while B can do it in 30 days. They work together for 10 days and the rest of the work is done by C in 5 days. If they get Rs 560 for the whole work, how much money will A get?
A and B together can complete a certain work in 20 days whereas B and C together can complete it in 24 days. If A is twice as good a workman as C, then in what time will B alone do 40% of the same work?
Pipes A, B and C can fill a tank in 30 h, 40 h and 60 h respectively. Pipes A, B and C are opened at 7 a.m., 8 a.m., and 10 a.m. respectively on the same day. When will the tank be full?