Just attempted SSC CGL 2021 Tier-I (HO 21/04/2022 S-3) Test Scored::47.5/ 200 Test listTake Test
Ytube Answers
X can complete half of the work in 20 days and Y can do one-fifth of the same work in 10 days. X started the work and left after 8 days. Then Y took over to complete the remaining work. The total number of days taken by them to complete the work is:
A tiger is 50 of its own heaps behind a deer. The tiger takes 5 heaps per minute to the deer’s 4. If the tiger & the deer cover 8 m & 5 m per heap respectively. What distance will the tiger have to run before it catches the deer?
A vertical stick 12 cm long casts a shadow 8 cm long on the ground. At the same time, a tower casts a shadow 40 m long on the ground. The height of the tower
12 Men and 6 women can do a piece of work in 14 days, while 8 men and 9 women can do the work in 16 days. if a man gets Rs 54 per days, what should be the wage of a woman per day?