A vertical stick 12 cm long casts a shadow 8 cm long on the ground. At the same time, a tower casts a shadow 40 m long on the ground. The height of the tower
24 men can do work in 16 days, while 32 women do the same work in 24 days. If 16 men and 16 women started the work, then after 12 days how many more men needed to finish the remaining work in 2 days?
3 men can do as much work as 5 boys. The wages of 3 boys are equal to those of 2 men. A piece of work for which 40 boys and 15 men are employed takes 8 weeks and costs Rs 15750. How long would it take if 20 boys and 20 men were employed and how much would it cost?