Just attempted SSC CGL 2021 Tier-I (HO 21/04/2022 S-3) Test Scored::47.5/ 200 Test listTake Test
Raja sen
Just attempted Profit Loss & Discount Test Scored::0/ 76 Test listTake Test
Ytube Answers
Pipes A, B and C can fill a tank in 30 h, 40 h and 60 h respectively. Pipes A, B and C are opened at 7 a.m., 8 a.m., and 10 a.m. respectively on the same day. When will the tank be full?
Two objects are moving on a circular path of length 600 m at a speed of 20 m/sec and 50 m/sec in the same direction. At how many point will both the objects meet on a circular path if they are continuously moving?
X can complete half of the work in 20 days and Y can do one-fifth of the same work in 10 days. X started the work and left after 8 days. Then Y took over to complete the remaining work. The total number of days taken by them to complete the work is: